Crowne Plaza & Staybridge Suites, Yas Island, Abu DhabiClient: ALDAR Properties PJSC Consultant: Waterman Construction Period: 18 months Completion Date: September 2009 Project Brief Full MEP & Fire Systems installation including:
MV and LV distribution; lighting; lighting control; Mains and sub mains distribution
/ switch gear; lightning protection, earthing and bonding, low voltage systems (access
control, CCTV and intercom), emergency power generation and BMS.
Plumbing and drainage – Above and below ground; waste water systems; Sanitary ware and accessories; Hot
and cold water; Water heaters and water tanks; Distribution and sump pumps; Grease
separators.
Duct installation and ventilation; Plant (AHU, FCU, Fans, Pumps & Heat Exchangers),
chilled water; fuel piping systems. Addressable fire alarm / emergency voice communication; Fire pumps, pipes and fittings, valves, pressure gauges, fire cabinets, reels and hoses, sprinkler systems, fire extinguishers and fire blankets. Strobe lights, sirens, illuminated signs, call points, control panels, storage cylinders, discharge |
![]() |
||||